South Street Bridge Construction - Alternate Routes to Church

The South Street Bridge (South Street Exit) on Rt.76 will be closed for construction starting Monday, 12/8 for its 24 month demolition/reconstruction project. Please factor in extra driving time before coming to service. For more info, check the South Street Bridge Reconstruction Project web site.

Alternate Directions:

From 76E (GIRARD AVE exit):

  • Take the GIRARD AVE exit
  • Turn left onto Girard Ave
  • Turn right onto 34th St.
  • Turn right onto Walnut St.
  • Turn left onto 48th St.
  • Church will be on your left

From 76E (MONTGOMERY DR. exit):

  • Take the MONTGOMERY DR. exit
  • Turn right on Montgomery Dr.
  • Turn left onto Belmont Ave
  • Turn right onto Girard Ave
  • Turn left onto Lancaster Ave & then an IMMEDIATE RIGHT onto 48th St.
  • Continue on 48th St. until you see the church on your left

From 76E (Take the GREY’S FERRY/UNIVERSITY AVE exit):

  • Take the GREY’S FERRY/UNIVERSITY AVE exit
  • Merge right onto University Ave
  • Turn left onto Spruce St.
  • Turn right onto 48th St.
  • Church will be on your right

From 76W (Take the UNIVERSITY AVE 346B exit):

  • Take the UNIVERSITY AVE exit (346B)
  • Turn left onto Spruce St.
  • Turn right onto 48th St.
  • Church will be on your right

  © 2006 Renewal Presbyterian Church | All Rights Reserved